Avon Luxury Bathroom

client

Timothy lll

Service

Restroom

budget

$27,500

year build

2025


Scope of Work – Luxury Bathroom Remodel

  1. Site Protection & Preparation
    Protect adjacent areas with floor coverings and dust control. Shut off and secure all plumbing and electrical prior to demolition.
  2. Selective Demolition
    Remove existing shower, wall finishes, vanity, mirrors, fixtures, and flooring as required. Haul away and dispose of all debris.
  3. Plumbing & Electrical Upgrades
    Reconfigure plumbing for new walk-in shower, toilet, and dual-sink vanity. Install rough-in for updated lighting, exhaust fan, and GFCI outlets per code.
  4. Shower Construction & Waterproofing
    Install custom shower pan, linear drain, and full waterproofing system. Construct recessed niche and prepare walls for large-format tile installation.
  5. Tile Installation
    Install luxury large-format wall tile in shower with decorative niche detail. Install new shower floor tile with proper slope and grout sealing.
  6. Vanity, Fixtures & Glass Installation
    Install dual-sink vanity, quartz countertop, undermount sinks, matte black fixtures, mirrors, toilet, and custom glass shower enclosure.
  7. Finishes & Detailing
    Complete drywall repairs, prime and paint walls and ceiling. Install trim, accessories, towel bars, and final hardware for a polished finish.
  8. Final Inspection & Cleanup
    Perform final walkthrough, test all plumbing and electrical systems, address punch-list items, and complete professional cleaning for turnover.

Mission and Value

Guided by Integrity. Built for the Future.

01

Decades of Proven Experience

02

Superior-Grade Materials

03

Full-Service Construction Capabilities

04

Innovative Building Practices

05

Sustainable Development Focus

06

Trusted Industry Relationships

07

Scalable Solutions for All Project Sizes